Change orders against a quote or work order: deltas, approval, running contract value.
Change-order is an MCP integration. Change orders against a quote or work order: deltas, approval, running contract value.
The registry lists a streamable-http connection at https://mcp.zovo.one/mcp/change-order. The endpoint declares these request headers: Authorization.
The published mcpb package is https://github.com/theluckystrike/mcp-servers/releases/download/v0.22.0/change-order.mcpb, version 0.22.0. Its declared MCP transport is stdio.
The package declares MCP_LICENSE_KEY: Optional Pro license key (MCPL1....). Verified offline..
Check the maintainer’s instructions for account access, authentication and the supported client configuration. Once connected, inspect the tools your client receives and try a small task that matches the server’s stated purpose. The registry description does not include a verified, complete tool list.
View the publisher’s registry entry · Project repository · Project website. This profile uses version 0.22.0 from the registry. Registration identifies the publisher namespace; it does not establish that this is a first-party integration for every service it connects.
Browse related developer tools MCP servers for tools that cover the same kind of work.
| Variable | Description | Required |
|---|---|---|
| MCP_LICENSE_KEY | Optional Pro license key (MCPL1....). Verified offline. | Optional |
Read, search and edit files inside allowed directories with the Model Context Protocol reference Filesystem server.
Retrieve version-aware library documentation and code examples with Context7 MCP, using resolve-library-id and query-docs.
Withseismic MCP Server - Model Control Protocol, the ://WITHSEISMIC way
A lightweight framework for building MCP (Model Context Protocol) servers in Java. uMCP provides a simple abstraction layer over the official MCP
Score prompt quality across 8 dimensions before they reach a model. Pre-flight, not post-hoc.
AI-driven live debugger with MCP bridge for Python, JS, TS, Rust, Java, C/C++