mcp-change-order MCP Server

Works with Claude Desktop, Claude Code, Cursor and any Model Context Protocol client. Runs on your own machine, or hosted with no install.

Local serverstdioMIT

What is the mcp-change-order MCP Server?

mcp-change-order is an MCP project maintained in the theluckystrike/mcp-change-order repository. The maintainer describes its purpose as “Works with Claude Desktop, Claude Code, Cursor and any Model Context Protocol client. Runs on your own machine, or hosted with no install”. Read the project documentation for the complete scope.

Local setup

The project provides a local client configuration using node. Follow the repository’s build and installation steps before copying it, and replace example paths with the paths on your own computer.

Source

Project documentation · Repository · Discovery listing. This profile records the public documentation checked on 2026-10-08.

Recorded tools

Check the linked publisher documentation and your connected client's tool list. Names and availability can vary with the server version and account permissions.

ToolWhat it does
change_order_createRaise a change order against a quote or work order: reference, client, title, date, and the original contract value on the first one
change_order_add_lineAdd an added, removed or changed line to a draft, with its quantity, unit price in minor units, reason and date
change_order_statusMove it along: draft to sent, sent to approved or rejected, draft or sent to void, each step dated
change_order_getOne change order in full: every line with its delta, the VAT, the history and the running value of the reference
change_order_listChange orders by reference, status, client and date range, with approved and pending deltas per currency
change_order_deleteDelete an empty draft raised by mistake. Free on every tier
contract_valueThe running value of one reference: original, approved delta, current value, pending delta held apart
change_order_documentThe change order as a plain-text document for the client to approve
change_order_invoice_payloadThe approved delta as invoice_create items (MAJOR units) and quote_create items (MINOR units)

How to install the mcp-change-order MCP Server

{
  "mcpServers": {
    "change-order": {
      "command": "node",
      "args": [
        "/absolute/path/to/mcp-change-order/dist/index.js"
      ]
    }
  }
}

From the project documentation. Replace placeholders and example paths before connecting.